NIGERIA GATEWAY

How to Obtain Building Planning Permit in Lagos

How to Obtain Building Planning Permit in Lagos

To undertake any construction project in Lagos State, Nigeria, it is mandatory to obtain a building planning permit from the Lagos State Physical Planning Permit Authority (LASPPPA). This permit ensures that your proposed development complies with local regulations, zoning laws, and safety standards. Here’s a step-by-step guide to obtaining a building planning permit in Lagos:

  1. Verify Land Title and Zoning Information:
    • Ensure that your land has a valid title, such as a Certificate of Occupancy (C of O), as this is crucial for the permit application.
    • Obtain planning information from the Ministry of Physical Planning and Urban Development to confirm the designated use for your land (e.g., residential, commercial) and any zoning restrictions.
  2. Engage Qualified Professionals:
    • Hire a registered architect to prepare detailed architectural drawings that comply with Lagos State building regulations.
    • Consult with a COREN-registered structural engineer to produce structural drawings and a letter of structural stability.
  3. Prepare Required Documentation:
    • Survey Plan: A document detailing the boundaries and measurements of your land.
    • Title Documents: Proof of land ownership, such as a C of O or registered deed of assignment.
    • Architectural Drawings: Plans detailing the design and layout of the proposed building.
    • Structural Drawings: Engineering plans ensuring the building’s structural integrity.
    • Mechanical and Electrical Drawings: Plans for mechanical systems (e.g., plumbing, HVAC) and electrical layouts.
    • Soil Test Report: Analysis of soil conditions to determine suitability for the proposed structure.
    • Environmental Impact Assessment Report: Required for certain types of developments to assess potential environmental effects.
    • Tax Clearance Certificate: Evidence of up-to-date tax payments by the applicant or company directors.
  4. Submit Application to LASPPPA:
    • Compile all necessary documents and submit your application to the LASPPPA district office corresponding to your project’s location.
  5. Pay Applicable Fees:
    • Upon submission, you’ll receive a payment advice detailing processing fees, infrastructure development charges, and other levies. Payments can be made online or at designated banks.
  6. Site Inspection:
    • LASPPPA officials will conduct a site inspection to verify the information provided and assess compliance with planning standards.
  7. Processing and Approval:
    • The application will be processed, and if all requirements are met, approval is typically granted within 28 days. You’ll be notified via email when your planning permit is ready for collection.
  8. Commence Construction:
    • With the approved building planning permit, you can begin construction. Ensure that a copy of the permit is kept on-site for inspection throughout the construction period.

Adhering to this process is essential to ensure legal compliance and avoid potential penalties, such as fines or demolition of unauthorized structures. Engaging professionals familiar with Lagos State’s building approval process can facilitate a smoother application experience.